SITE PREPARATION

Everything between raw land and a buildable site: clearing, stripping topsoil, cut-and-fill grading, drainage, and a compacted pad ready for footings or a slab.

COMMON USES

  • Stick-built home sites
  • Mobile and modular home setups
  • Shops, barns, and metal buildings
  • Small commercial pads

TYPICAL PROJECT PROCESS

  1. Clear the building envelope and a working buffer around it.
  2. Strip and stockpile topsoil.
  3. Cut high spots, fill low spots, and compact in lifts.
  4. Build the pad to the size and elevation the builder specifies.
  5. Cut drainage swales or install culverts so water moves away from the pad.

EQUIPMENT USED

  • Dozer
  • Excavator
  • Skid steer
  • Compactor
  • Dump truck

COMMON QUESTIONS

How much dirt is needed for a house pad?

Depends on slope and pad size. A flat half-acre lot might need only stripping and compaction; a sloped lot can need hundreds of yards of fill. We measure and quote.

How long does a house pad take?

Most residential pads take two to five working days once we're on site, weather depending.